1 Which of the below is a disadvantage of frame structure?- (A) Ease of construction
- (B) Economy
- (C) Speed of Construction
- (D) Span length
2 Which of the following type of walls is constructed to divide the space within the building?
- (A) Partition wall
- (B) Cavity wall
- (C) Party wall
- (D) Curtain wall
3 How many types of foundation are there based on depth?
- (A) 3
- (B) 4
- (C) 2
- (D) 5
4 Which of the below is not a preliminary consideration for building a foundation?
- (A) Bearing capacity of soil
- (B) Ground water condition
- (C) Settlement control
- (D) Soil organisms
5 Which is the first step for job layout?
- (A) Dewatering
- (B) Site clearance
- (C) Location plan
- (D) None of above
6 Great skill and skilled labour are required for laying ——
- (A) Coursed rubble masonry
- (B) Ashlar fine masonry
- (C) Ashlar chamfered masonry
- (D) Dry rubble masonry
7 The removal of excess of water from the saturated soil mass is called ——
- (A) Drainage and Dewatering
- (B) Saturation
- (C) None of the mention
- (D) All of the mention
8 Through stone is also called as ——
- (A) Face stone
- (B) Back stone
- (C) Bond stone
- (D) Heart stone
9 —– is defined as the main plank which remains in contact with sides of trench.
- (A) Sheeting
- (B) Wale
- (C) Sheathing
- (D) Bracing
10 In which bond brick is laid with its length in the direction of a wall?
- (A) Header
- (B) Flemish
- (C) Stretcher
- (D) English
11 In which method of underpinning, the existing wall is divided into suitable sections of width above 1.20 meter to 1.50 meter?
- (A) Chemical method
- (B) Pile method
- (C) Miscellaneous method
- (D) Pit method
12 Which of the below should be avoided in brick masonry?
- (A) Horizontal joints
- (B) Queen closer
- (C) Brick bat
- (D) Vertical joints
13 In —–arrangement, the vertical sheets are placed nearer or sometimes, touching each other.
- (A) Stay bracing
- (B) Box sheeting
- (C) Vertical sheeting
- (D) Runner
14 —– bond is better in appearance than English bond.
- (A) Flemish bond
- (B) Double flemish
- (C) Single flemish
- (D) Poly flemish
15 Sometimes the structures are to be temporarily supported is known as —–.
- (A) Scaffolding
- (B) Underpinning
- (C) Grouting
- (D) Shoring
16 How many types of combined footing is possible?
- (A) 1
- (B) 2
- (C) 3
- (D) 4
17 The portion of bricks cut across the width in half is called ——
- (A) Half split
- (B) Half closer
- (C) Half bed
- (D) Half bat
18 Which is the level below window called
- (A) Pane level
- (B) Lintel level
- (C) Sill level
- (D) Plinth level
19 How many types of stone masonry are available?
- (A) 1
- (B) 2
- (C) 3
- (D) 4
20 The block of stone used at the corner of two walls meeting at90 degree is called as ——-
- (A) Hearting
- (B) Quoin header
- (C) Header
- (D) None
21 In which type of construction wall footing is used?
- (A) Framed structure
- (B) Load bearing structure
- (C) In both
- (D) Composite structure
22 In framed structure what transfer the load to columns
- (A) Foundation
- (B) Beams
- (C) Slabs
- (D) Roofs
23 Double scaffolding is used for—–
- (A) Brick masonry
- (B) Composite masonry
- (C) Stone masonry
- (D) All of the above
24 Pier foundation is also called as ——-
- (A) Box
- (B) Caisson
- (C) Bridge
- (D) Girder
25 In—– shore arrangement, the inclined supports are given to the external walls from the ground.
- (A) Raking shore
- (B) Flying shore
- (C) Dead shore
- (D) Patented shore
26 DPC is mainly laid on —–
- (A) Footing
- (B) Floor
- (C) Foundation
- (D) Plinth
27 —— is a very light type of scaffolding and can be used only for the maintenance work such as painting, pointing, whitewashing etc.
- (A) Trestle scaffolding
- (B) Suspended scaffolding
- (C) Single scaffolding
- (D) Needle scaffolding
28 —— is a simplest form of cofferdam
- (A) Single wall cofferdam
- (B) Earth fill cofferdam
- (C) Cellular cofferdam
- (D) Rock fill cofferdam